Pool Deck (deck 15) was completely renovated and redesigned, also receiving "The Lime and Coconut" (2-level poolside bar/first added on Navigator OTS). The 63-day drydocking project (at Navantia Shipyard in Cadiz Spain) includes adding new venues, including some fleet-firsts. Ship's Royal Amplified drydock refurb is scheduled for 2019 (September 22 - November 23) and budgeted USD 165 million (EUR 150 million). Oasis OTS deck plan changes 2019 refurbishment review "Choice" package (cost $80 PP) includes Chops Grille (steakhouse), Giovanni's, Izumi (Japanese), Samba Grill (Brazilian steakhouse).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |